(509) 352-0550

City of Spokane vs Spokane County: Whose Grease Rule Applies to You

Depends on whose sewer bill you get. The county’s rule is on this site in full; the city’s we do not quote, and we say so.

Call (509) 352-0550

Spokane County sewer customers

Most of Spokane Valley, Liberty Lake’s county-served areas, Mead, and the unincorporated urban area are on county sewer, under County Code 8.03 and 8.03A: traps every 30 days, interceptors every 90, 25% rule, pumped dry, no additives, records three years. The full rule → Spokane Valley’s own code chapter (SVMC 22.160) adopts the county pretreatment code by reference, and the county owns and operates the sewers there; the county program administers them. Why the county clock applies in Spokane Valley →

City of Spokane customers

The City of Spokane runs its own wastewater pretreatment program under Spokane Municipal Code 13.03A. We do not quote the city’s code on this site. What we can say: the city’s program is built on the same federal pretreatment rules and the same state plumbing code, and in practice city inspectors expect the same things — a sized device, a cleaning schedule you can show, records, no additives. We service city kitchens on the county clock as a conservative default and document every visit the same way; if your city permit sets a different interval, tell us and we keep that one.

Both

Washington adopts the 2021 Uniform Plumbing Code (WAC 51-56-003), which is where device sizing comes from in both jurisdictions; the state sets no cleaning interval of its own. The Spokane Regional Health District licenses more than 2,500 permanent food establishments across the county — the kitchens all these rules exist for.

Not sure which you are?

Look at the sewer line on your utility bill, or tell us the address. We will tell you which code governs and schedule to it.

Outside both systems, the towns write their own rules: Cheney, Airway Heights and, across the state line, Coeur d’Alene, Idaho each have a page.

City or county

Address and device size. We handle the rest.

Call (509) 352-0550
Plain-English guidance, not legal advice. Quotations are from Spokane County Code Chapter 8.03 (Sewer Use) and 8.03A (Pretreatment), Municode version dated Sep 11, 2026, read 2026-10-08. The City of Spokane publishes its own pretreatment rules (SMC 13.03A) through eCode360 and they are not quoted on this site; where this site describes them it says so. Spokane Valley’s one-section chapter (SVMC 22.160) is quoted from its 2016 published text on the Spokane Valley page. Confirm current requirements with the county’s FOG program at (509) 477-7579.
📞 Tap to call (509) 352-0550