Who runs the sewer under your kitchen
Spokane County. The City of Spokane Valley says so in its own words: “Public sewer facilities in the City of Spokane Valley are owned and operated by Spokane County” (City of Spokane Valley, Applicant Advisory — Sewer Concurrency, April 27, 2004). The advisory is old and its capacity warnings are long stale; the ownership sentence is the part that still matters, because it decides whose maintenance rule you are under.
What the city’s own code says
The Spokane Valley Municipal Code has one section on the subject, and it points at the county. SVMC 22.160.010, Wastewater pretreatment standards: “Pursuant to RCW 35A.11.020 and 35A.12.140, Spokane County Code Chapter 8.03A, as adopted or amended, is hereby adopted by reference as the wastewater pretreatment standards for the City of Spokane Valley. The city clerk is to maintain a copy of Spokane County Code Chapter 8.03A” (Ord. 10-019 § 2, 2010).
Read that carefully. Chapter 8.03A is the county’s pretreatment code: the fats-oils-and-grease discharge prohibition (8.03A.0201(B)(19)), overflow liability (8.03A.0213) and the fine and penalty sections (8.03A.0906, 8.03A.1001). The 30-day and 90-day cleaning clocks, the 25% line, the pumped-dry standard, the additive ban and the three-year records rule are in a different chapter, 8.03.5080 of the county sanitary sewer code. The city code does not adopt chapter 8.03.
So how does 8.03.5080 reach a Valley kitchen?
Through the sewer, not the city. The county applies chapter 8.03 to its “sewer service area,” defined as the area “in which the county owns or controls and maintains a public sewer” (SCC 8.03.1832). The county owns and operates the sewers in Spokane Valley, so 8.03.5080 applies as a condition of county sewer service. That is the honest way to state it: Spokane Valley does not have a 90-day pumping ordinance; your kitchen is a Spokane County sewer customer, and the county’s sewer-utility rule is the one its inspectors carry. No section quoted on this site says in so many words that chapter 8.03 binds every address inside Valley city limits; the county FOG program at (509) 477-7579 is the office that confirms it for yours.
The rule, in brief
- Traps: “at least every thirty (30) days or whenever twenty-five percent (25%) of the trap volume is occupied by grease and solids, whichever occurs first” (8.03.5080.B.1).
- Interceptors: “pumped by a wastewater hauler at least every ninety (90) days or whenever twenty-five percent (25%) of the last chamber volume is occupied by grease and solids, whichever occurs first,” and immediately if grease shows in the sample box (B.2).
- Method: pumped dry; sides, baffles and tees washed; wash water not returned (B.5). Enzymes, bacteria and emulsifiers not permitted (B.6).
- Records: date and time, volume removed, hauler — on site three years (C).
- Exception and cost recovery: the director may extend the interval on evidence (E); sewer cleaning caused by a neglected device is billed to the owner (F).
The full county rule, clause by clause →
Fines and penalties
These do come through the city code, because 22.160.010 adopts chapter 8.03A: administrative fines up to $10,000 per violation per day (8.03A.0906), civil penalties of $1,000 to $10,000 per violation per day (8.03A.1001), and liability for the county’s costs when your discharge causes an overflow (8.03A.0213). Add cost recovery for sewer cleaning under 8.03.5080.F. The fines page, with the section wording →
Who to call
Spokane County Environmental Services FOG program: (509) 477-7579, ESPretreatment@spokanecounty.org. There is no separate city FOG office; the county program is the one that inspects Valley kitchens and the one that answers questions about them. For the city code itself, 22.160.010 names the office: the city clerk keeps the copy of chapter 8.03A.
What we do not quote
The text of 22.160.010 above is the chapter as published in 2016, when the code was current through Ordinance No. 16-008 (June 7, 2016). The city has since moved its code to eCode360, and we do not quote the current text on this site; whether 22.160 has been amended since 2016 is a question for the city clerk’s office. Nothing we quote sets a Spokane Valley fee, permit or inspection schedule, because the city has none of its own on this subject.
How we service Spokane Valley kitchens
Same truck, same crew and same record as our Spokane work. Under-sink traps go on the monthly route; interceptors are pumped dry by a permitted hauler on the 90-day clock or sooner, with the percent-full reading taken before the hose goes in. We plan at 20% so you are never operating over the 25% line between visits, and the reading at the first service replaces the calculator estimate. Every visit leaves the 8.03.5080.C record — date and time, volume removed, hauler — plus a disposal manifest for where the waste went, in the folder the county inspector asks for. Sprague, Pines, Argonne, the Sullivan corridor, Dishman–Mica: one schedule, kept for you.
Spokane Valley, on the county clock
Device size and address. We schedule to 8.03.5080 and write the record.
Call (509) 352-0550