(509) 352-0550

Grease Trap Service for Spokane Restaurants

Most restaurants here run two devices on two clocks. Here is how to keep both without thinking about either.

Call (509) 352-0550

Two devices, two clocks

A full-service kitchen in Spokane County typically has an under-sink trap on the pot sink and an in-ground interceptor outside. The county code gives each its own schedule: traps “at least every thirty (30) days or whenever twenty-five percent (25%) of the trap volume is occupied by grease and solids, whichever occurs first” (8.03.5080.B.1); interceptors “at least every ninety (90) days or whenever twenty-five percent (25%) of the last chamber volume is occupied,” and immediately if grease shows in the sample box (B.2). A restaurant that keeps the 90 days and forgets the 30 is out of compliance twelve times a year.

Where the 25% line lands by kitchen

KitchenTrap (30-day clock)Interceptor (90-day clock)
Cafe, no fryerMonthly is usually enoughQuarterly is usually enough
Full-service with fryers25% in 2 to 4 weeks: pump before the month ends25% in 6 to 10 weeks on a 1,000-gal tank
Wings, fried chicken, teriyaki2 to 3 weeks4 to 7 weeks
Pizza and bakeryMonthlyQuarterly, watch the solids

Planning ranges for a scheduled route, not code figures. The reading at the first service sets your real interval.

What the county counts as a cleaning

Pumped dry; sides, baffles and tees washed down; wash water taken away (B.5). A skim of the cap is not a service and leaves the solids that put you back at 25% in weeks. Every visit produces the record C requires: date and time, volume removed, who did it.

The fryer-oil stream

Fryer oil never goes to a drain. It goes to the rendering drum. Fats, oils and grease that cause or threaten obstruction are a prohibited discharge under 8.03A.0201(B)(19), and an interceptor cannot catch what arrives as a gallon at a time.

City kitchens

If your sewer bill comes from the City of Spokane, its own program under SMC 13.03A applies; we do not quote that code on this site. We schedule city kitchens to the county clock as a conservative default. City versus county →

Two devices, one call

Monthly trap route, quarterly interceptor, records every visit.

Call (509) 352-0550
Plain-English guidance, not legal advice. Quotations are from Spokane County Code Chapter 8.03 (Sewer Use) and 8.03A (Pretreatment), Municode version dated Sep 11, 2026, read 2026-10-08. The City of Spokane publishes its own pretreatment rules (SMC 13.03A) through eCode360 and they are not quoted on this site; where this site describes them it says so. Spokane Valley’s one-section chapter (SVMC 22.160) is quoted from its 2016 published text on the Spokane Valley page. Confirm current requirements with the county’s FOG program at (509) 477-7579.
📞 Tap to call (509) 352-0550