| Stage | What you notice | What the code says |
|---|---|---|
| Day 30 | Nothing. The trap passed 25% a week ago. | Traps: 30 days or 25%, whichever first (8.03.5080.B.1). |
| Weeks 6–10 | Dish-pit smell; slow sink on Friday. | Interceptor nearing 25% of the last chamber (B.2). Grease passing the outlet. |
| Day 90+ | Grease in the sample box. | “Shall be pumped immediately” (B.2). |
| Inspection | A FOG inspector asks for three years of records. | Records required on site (C); inspection authorised (F). |
| Bill | The county clears the main on your block. | Cleaning or repair “billed to the owner” (F); overflow liability (8.03A.0213). |
| Fine | Administrative fine, then civil penalty. | Up to $10,000 per violation per day (8.03A.0906); $1,000–$10,000 per day (8.03A.1001). |
The arithmetic
The only local figure anyone publishes for a scheduled cleaning is in the hundreds of dollars. One day of the administrative-fine ceiling is ten thousand. Nobody who reads the table skips the service; the people who skip it are the ones who never read it.
The way out
Pump it dry, wash the baffles, write the record, set the interval from the reading. The ladder stops at whichever rung has a record attached.
Plain-English guidance, not legal advice. Quotations are from Spokane County Code
Chapter 8.03 (Sewer Use) and 8.03A (Pretreatment), Municode version dated Sep 11, 2026, read 2026-10-08.
The City of Spokane publishes its own pretreatment rules (SMC 13.03A) through eCode360 and they are not
quoted on this site; where this site describes them it says so. Spokane Valley’s one-section chapter (SVMC 22.160)
is quoted from its 2016 published text on the Spokane Valley page. Confirm current
requirements with the county’s FOG program at (509) 477-7579.